A2: Breeze makes works on the bridge over the River Sado, direction Sul / Norte, between September and October.


Brisa will proceed with the replacement of expansion joints on the bridge over the River Sado, no sense Sul / Norte, in subsection Alcacer do Sal / North Grândola, da Auto-estrada do Sul (A2).

Bridge A2 Rio Sado_800x800Brisa road concession (BCR) will begin the substitution work on expansion joints on the bridge over the River Sado, no sense Sul / Norte, in subsection Alcacer do Sal / North Grândola, A2 – Auto-estrada do Sul. Estes trabalhos irão desenvolver-se entre os meses de Setembro e Outubro.

In order to minimize inconvenience to motorists circulating there, the work will be performed with restrictions and traffic diversions being ensured circulation in two lanes in each direction.

Brisa thanks in advance the understanding and cooperation of motorists and hopes to contribute to reduce any inconvenience resulting from this operation, It is certain that the possible discomforts will largely be offset by quality level, safety and comfort that result from a motorway better adapted to the needs of those who use.

For updated information please consult the website www.brisa.pt.


Share This Post On
468x60.jpg