Beja: EMAS is urgent intervention at Quinta D'El Rey.


Disruptions in the feed line led to EMAS to make an urgent intervention in Quinta D'El Rey, in Beja.

The succession of recent anomalies recorded in a feed line responsibility for the water supply to Beja, Neves, Baleizão and several route consumers, They led to EMAS Beja in this month of June to proceed with the replacement of this infrastructure in much of its length at Rua Miguel Torga, on Fifth d'el King in Beja.

a change to the investment program to accommodate this intervention whose direct and indirect costs was required beyond the 20 thousand euros.

actually, It was a critical infrastructure that despite being recently built (next to 10 year old) I must have had an intervention of this nature with a view to rehabilitation before they had recorded some episodes of critical nature.

The substituted portion, about 300 meters, resorted to an unconventional method, with the placement of new trenchless pipe opening throughout its length and will ensure a security reinforcement in the water supply service to the population of the city of Beja, Neves and Baleizão.


Share This Post On
468x60.jpg